Ethernet cable estimator

Estimate how much cable, how many boxes, jacks and patch-panel ports a wiring job needs, and which cable category suits the speed you want.

Updated

With JavaScript on, the calculation runs in your browser. Your figures are added to the page address so you can bookmark or share the result; the address sent to analytics leaves them out. Without JavaScript the form sends your figures over HTTPS for one calculation; the response is not cached and the figures are not sent to analytics. Every result says whether it comes from a standard, from arithmetic on your figures, from an estimate or from your own input.

One per outlet, access point or camera.

In the unit chosen above. Leave empty to estimate from floor area.

Checked against the 100 m (328 ft) limit.

All floors together, in square feet or square metres.

In the unit chosen above. Used only for the estimate from floor area. 3 m (about 10 ft) if left empty.

%

Added to every run for routing around obstacles. A planning assumption.

In the unit chosen above. Extra cable at the two ends. 2 m (about 6.5 ft) if left empty.

Result

The result appears here after you select Calculate.

How this is calculated

Assumptions

  • Slack defaults to 10% of each run and the termination allowance to 2 m per run. Both are planning assumptions, shown and editable.
  • When the run length is estimated: each floor is a square with the rack at its centre, cable follows the walls, and each run rises and drops one storey height in total.
  • Storey height defaults to 3 m (about 10 ft) when left empty. It is a planning assumption, used only for the estimate from floor area.
  • Cable is bought in 1,000 ft (305 m) boxes, and every run ends in one jack and one patch-panel port.
  • Patch panels are counted as 24-port panels.
  • Category: Cat5e for 1 and 2.5 Gbps, Cat6 for 5 Gbps, Cat6a for 10 Gbps, each over a 100 m channel. Cat6 is also specified for 10 Gbps on channels up to 37 m.

Limits of this calculator

  • An estimate from floor area can be far off in a long or irregular building, or when the rack is in a corner. A measured run length is better.
  • Waste from the unusable end of each box is not added; with long runs, buy a spare box.
  • Conduit, faceplates, patch cords, labour and fire-rating requirements are not covered.

Sources

Other calculators

Your privacy choices

RouterHaus uses Google Analytics to understand which pages help people. We don't sell personal information. Advertising cookies are off.

Until you save a choice here, analytics cookies are off for visitors in the EEA, UK and Switzerland and in browsers that send Global Privacy Control; elsewhere they're on. When they're off, Google may still receive cookieless pings without identifiers. A choice you save here applies in this browser wherever you are, and your analytics choice applies even if the browser sends Global Privacy Control.

Details are in our privacy policy.